Trails & Paths
- Golf cart paths $6.50–9 / sq ft
- DG walking paths $7.50–10 / sq ft
- Natural walking trails $8–14 / ft
- Erosion & drainage from $400
- Bike trails $8–40 / ft
Golf cart paths, decomposed granite walking paths, senderos, erosion control, bike trails and pump tracks, machine and hand built from Marble Falls.
Most of our work is the quiet stuff that makes a property usable: the path to the lake, the cart route to the course, the sendero through the cedar. The bike work proves we can build anything in this ground.
Cart paths to the dock or the course, garden paths, dry creek beds that make a washout look intentional.
Greenbelt trail repair, DG path rebuilds, condition reports for the board and Care Plans after every big storm.
Senderos, cedar thinning, water bars and culverts that protect roads, hunting access and wildlife valuation.
A dependable sub for paths, drainage and pre-landscape clearing who shows up on schedule and leaves it clean.
Hill Country soil is often only a few inches deep over caliche or limestone, so heavy rain runs off instead of soaking in. On a slope, that runoff picks up speed and cuts gullies through anything bare. West toward Marble Falls and Llano, the ground turns to coarse granite that drains differently again.
That's why paths here fail: no crown, no base, no plan for the water. We read the ground first, then build the drainage into the path.
Background: Hill Country erosion guide · Burnet County soils
These are typical ranges for Highland Lakes jobs. Rock, slope, access and length move the final number. Your written proposal is fixed before work starts.
| Work | Typical price |
|---|---|
| Golf cart path6–8 ft, compacted base, stabilized DG, crowned and drained | $6.50–9 / sq ft |
| Decomposed granite walking path4 in. compacted, stabilizer, steel or stone edge | $7.50–10 / sq ft |
| Natural-surface walking trail3–4 ft, machine cut, outsloped, rock armored | $8–14 / ft |
| Sendero12–16 ft, mulched, crowned where needed | $1.50–3 / ft |
| Selective cedar clearingForestry mulching, oaks kept, mulch left to hold soil | $2,400–5,500 / acre |
| Erosion controlCheck dams, swales, dry creek beds, rolling dips | from $400 |
| Backyard pump trackDesigned by THCMTB, built by TX Trailcraft | from $6,500 |
Mobilization $450 within 30 miles of Marble Falls. Project minimum $2,500. 30% deposit to schedule.
We walk the route, check the soil and rock, and watch where water wants to go. Usually within 72 hours of your request.
A written proposal within 48 hours: the base build, the base build plus our Storm-Proof drainage package, and both plus a Care Plan.
Excavator and hand crew. 811 called before we dig. Daily cleanup, no ruts left behind.
After-storm checks within 72 hours, DG top-offs and drain cleanouts, so the path you paid for stays that way.
One percent of every TX Trailcraft invoice goes into the Build Back Fund. It pays for donated community builds like school trails, park pump tracks and trail repairs, and puts bikes under kids who don't have one. Your cart path helps build the next kid's first trail.
How the fund worksFree site walks in the core area. Farther out, we bundle visits to keep mobilization fair.
Most stabilized decomposed granite cart paths we plan run $6.50 to $9 per square foot, about $45 to $63 per linear foot at 7 feet wide. That includes compacted base, a crowned surface and drainage outlets. Access, rock and length move the number, so we confirm it on a free site walk.
No. Most of our work is paths, cart paths, senderos, drainage and HOA trail repair. Bike trails and pump tracks are where we sharpened our skills, because a trail that holds up to riders and storms is the hardest thing to build in this ground.
Every path gets a crown or outslope, a compacted base, stabilized surface and a planned exit for water: rolling dips, swales, check dams or culverts. Hill Country soils are thin over granite, limestone and caliche, so water runs off fast. We design for where it goes.
Our minimum is $2,500, which covers one machine day plus mobilization. Small items like a few check dams or a short garden path can be bundled into one visit.
Yes. We provide written condition reports, phased budgets for board approval and quarterly Care Plans with after-storm inspections.
Tell us what you want built and where the water goes when it rains. We'll walk it, measure it and send a written Good / Better / Best proposal within 48 hours.